Summer 1999: Day 3

Site where the construction crew will be working. It is just on the other side of the basketball court shown above. Footings must be dug and poured along the perimeter of this building. This is a "before" shot, and hopefully we'll be able to document the progress here through the week.


The basketball court, showing the posts and bracing already in place. There is a similar structure on the other side of the court. A crew is supposed to come this week and put a roof on it which will completely shelter the court and will really be nice.


The new outside of the dining hall. The hall has been extended, the floor raised, and has had a new roof put on. There's much more room in it now and it is much cooler than before.


Summer 1999: Day 4

The construction crew digging the footings for the new building.

Some of our group, along with Jim Bloomstrand on the far left, eating a nice meal prepared for us and served at Bro. Moises Torres' church in Cordoba.